Brewery Pasteurizer Upgrade
Allphase Mechanical Plumbing & Heating Ltd. completed a pasteurizer upgrade to improve performance, reliability, and temperature consistency. The project included reworking steam and water connections for each pasteurizer zone, upgrading process piping, and installing new valves to optimize flow and control. The upgraded system delivers improved efficiency, consistent pasteurization, and increased reliability while meeting sanitary and food-grade standards, all completed with minimal disruption to brewery operations.
Pasteurizer upgrade before completion
Cutting sanitary tube
Cutting out old steam valves
New steam valves installed
Pasteurizer upgrade after completion
Compressed Air, Process Water & Waste Water Installation Cardboard Packaging Plant
Allphase Mechanical Plumbing & Heating Ltd. completed the installation of TSSA-certified compressed air piping, along with new process water and wastewater systems, as part of a cardboard packaging plant’s relocation to a larger facility in Toronto. The project involved building out critical utility services within an existing industrial space to support production operations. All systems were installed in accordance with TSSA requirements, applicable codes, and industry best practices, delivering safe, reliable, and efficient operation while accommodating current and future production demands.
Threading pipe
TSSA certified compressed air install
Compressed air dryer hookup with bypass
Process water line install
Compressed air, process water & waste water lines
Paint Line Welding Services – Manufacturing Facility
Allphase Mechanical Plumbing & Heating Ltd. completed specialized welding work in support of a paint line at a Toronto manufacturing facility. The scope included welding and modification of process piping and mechanical components to support paint application and material handling requirements. All work was performed by certified welders with careful attention to alignment, durability, and compatibility with existing paint line equipment. The welding was completed within an active production environment and coordinated to maintain safety, quality, and operational continuity.
Stick welding
Carbon pre-fab
Position weld
Pre-fab installed
Pre-fab painted and complete
Brewery Pasteurizer Float Installation
Allphase Mechanical Plumbing & Heating Ltd. completes pasteurizer float installations for brewery operations, supporting accurate level control and reliable system performance. The scope includes integration of the float assembly into the existing pasteurizer system using sanitary fusion welding to maintain hygienic, food-grade standards. All work is performed with careful attention to alignment, cleanliness, and manufacturer specifications to ensure consistent operation, product quality, and long-term reliability within an active brewery environment.
Fusion Weld Pre-Fab
Drilling holes for mechanical floats
Sanitary piping fabrication
Sanitary pipe installed
Pre-Fab installed
Silicone Plant Decommissioning & Equipment Removal
Allphase Mechanical Plumbing & Heating Ltd. completed a phased decommissioning project at a silicone manufacturing facility in Toronto in preparation for a planned future plant shutdown. The scope of work included the safe isolation, disconnection, and removal of select process piping, conveyors, and production machinery. All work was performed with a focus on safety, environmental responsibility, and coordination within an active facility. The project supported an orderly transition toward shutdown while maintaining safe conditions and minimizing disruption to remaining operations.
Mixer lift track removal
Removing mixer lift cylinder
Conveyor removal
Cutting mixer anchors
Pipe Demolition
Industrial Rigging Services
Allphase Mechanical Plumbing & Heating Ltd. provides a full range of industrial rigging services at facilities across Toronto, supporting equipment handling and relocation requirements. The scope includes crane lifts, forklift operations, chain fall rigging, and controlled manual rigging to safely move, position, and remove machinery and components. All rigging activities are planned and executed with a strong focus on safety, load control, and site coordination. Work is performed by experienced tradespeople to ensure efficient execution while protecting personnel, equipment, and surrounding facilities.
Lid feeder removal
Removing stainless pipe spool
Lifting gearbox onto truck
Mixer lid removal
Lifting stainless tank
Residential Plumbing & Heating Services
Allphase Mechanical Plumbing & Heating Ltd. provides complete residential plumbing and heating services for new construction, renovations, and service work. The scope includes underground rough-ins, water and drainage systems, heating installations, and ongoing service and repairs. All work is completed in accordance with applicable codes and best practices, with a focus on reliability, efficiency, and long-term performance. Our team works closely with homeowners and builders to deliver safe, professional solutions from initial rough-in through final service.
Underground plumbing trench
Underground plumbing
Rough ins
Plumbing
NTI Boiler install